CURRENT DISTURBANCES
Line 656 | Sehlde, Hubertusstraße closure: 13/04 - 26/06/2026
Due to sewer construction work, Hubertusstraße in Sehlde is closed during the period
Lines 656 & 660 | One-sided closure Salzgitter-Bad, Am Pfingstanger: 23/03 - 10/04/2026
Due to construction work, the street Am Pfingstanger, in Salzgitter-Bad,
Line 658 | Timetable adjustments between Berel, Hohenassel and Baddeckenstedtzum: 13.04.2026
As of 13 April 2026, we will be taking on smaller trips on some
Line 656 | L498 closure, between Ringelheim and Sehlde: from 14.08.2025 until further notice
Due to the closure of the L498 in the area of the Banh crossing at the