CURRENT DISTURBANCES
Routes 656 – 658 – 660 | Timetable change on 13 August 2026
To optimise school transport, we will be introducing the following changes on 13 August 2026
Line 656 | Half-sided closure Sehlde, Herrer Straße/L496: 05.06. - 30.09.2026
Due to sewer construction work, Herrer Straße/L496 in Sehlde is closed in the
Line 656 | L498 closure, between Ringelheim and Sehlde: from 14.08.2025 until further notice
Due to the closure of the L498 in the area of the Banh crossing at the