CURRENT DISTURBANCES
Line 656 | Half-sided closure Sehlde, Herrer Straße/L496: 05.06. - 30.09.2026
Due to sewer construction work, Herrer Straße/L496 in Sehlde is closed in the
Line 656 | L498 closure, between Ringelheim and Sehlde: from 14.08.2025 until further notice
Due to the closure of the L498 in the area of the Banh crossing at the