{"id":3473,"date":"2026-07-31T10:02:07","date_gmt":"2026-07-31T08:02:07","guid":{"rendered":"https:\/\/vb-bachstein.de\/hornburg\/?p=3473"},"modified":"2026-07-31T10:08:34","modified_gmt":"2026-07-31T08:08:34","slug":"routes-7554-and-757-closure-of-beuchte-hauptstrasse-03-08-and-07-august-2026","status":"publish","type":"post","link":"https:\/\/vb-bachstein.de\/hornburg\/en\/linien-7554-757-sperrung-beuchte-hauptstrasse-03-08-07-08-2026\/","title":{"rendered":"Routes 754 & 757 | Closure at Beuchte, Hauptstra\u00dfe: 3\u20137 August 2026"},"content":{"rendered":"
Due to roadworks, the main road in Beuchte will be closed from Monday 3 to Friday 7 August 2026. Bus routes 754 and 757 will be diverted within the town. The Beuchte bus stop will not be served. A temporary bus stop is available on Lengder Stra\u00dfe, near the cemetery.<\/p>","protected":false},"excerpt":{"rendered":"
Due to roadworks, the main road in Beuchte will be closed from Monday 3 to Friday 7 August 2026. Bus routes 754 and 757 will be diverted within the town. The Beuchte bus stop will not be served. A temporary bus stop is available on Lengder Stra\u00dfe, near the cemetery.<\/p>","protected":false},"author":6,"featured_media":4003,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[33],"tags":[],"class_list":["post-3473","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-fahrplanabweichungen"],"yoast_head":"\n